ROAD WORKS NOTIFICATION
During the upcoming September school holidays, Symal and Road Projects Victoria will be carrying out road works installing underground drainage along Ernst Wanke Road. During this time there will be a temporary lane closure on Ernst Wanke Road where traffic will only be able to travel one direction at a time. The works will be completed in two sections, meaning entry to the school is through the driveway that is open at the time. Traffic controllers will safely guide motorists for drop off and pick up at the YLV Holiday Care program.
A photo of the areas outside the front of the school impacted by the road works is attached to the newsletter. The road works will take place from 7am to 6pm between Saturday 17 September and Sunday 2 October.